Markus Hendrik Katilik

Kuala Lumpur,14

Overview

21
21
years of professional experience
5
5
years of post-secondary education
1
1
Language

Work History

Head of Department, Engineering Project Division, I&C (Instrumentation and Controls)

TPSC Engineering (Malaysia) Sdn Bhd
05.2017 - Current
  • Led and managed I&C group of six engineers, overseeing the BOP scope and subcontracted engineering services
  • Provided technical direction and coordination for engineering activities, ensuring deliverables were completed on time, on quality, and within budget while complying with Environmental, Health, and Safety (EHS) standards and customer contract requirements
  • Implemented project strategy and managed engineering budget, monitoring costs, and driving productivity for 7 projects executed almost at same time
  • Acted as primary contact point with customers, their representatives, and external organizations, ensuring effective communication and coordination throughout project lifecycle
  • Scoped encompassed various components, including Instrument Design Engineering, Instrument Bulk Material, SWAS, CEMS, Communication Systems, CCTV, Cable Engineering, and RFQ processes leading to vendor selection.
  • Related to technical Project Management/Managerial, providing technical direction, ensuring compliance with standards, and meeting project requirements.
  • Related to cost management, implementing project strategies, managing budgets, and driving productivity.
  • Related to operational oversight: providing input for decision-making processes, performing technical risk assessments, driving risk mitigation efforts, and approving purchase orders.
  • Worked well in team setting, providing support and guidance.
  • Proved successful working within tight deadlines and fast-paced environment.
  • Exercised leadership capabilities by successfully motivating and inspiring others.
  • Organized and detail-oriented with strong work ethic.
  • Used strong analytical and problem-solving skills to develop effective solutions for challenging situations.
  • Passionate about learning and committed to continual improvement.
  • Cultivated interpersonal skills by building positive relationships with others.

Lead Engineer/Global Design Leader, Controls Engineering

General Electric (GE)
12.2015 - 04.2017
  • Tendering Responsibilities – Reviewed customer RFQs (Request for Quotation), developed concepts, and prepared Bills of Quantities (BOQs). Raised clarifications and deviations, developed cost estimates, and prepared technical proposals Involved in over 20 proposals across Asia Pacific region, including Japan, Thailand, Malaysia, Indonesia, and Philippines.
  • Execution Responsibilities – Managed and led engineering team responsible for integrated plant controls, including Gas Turbine, Steam Turbine, Generator, Heat Recovery Steam Generator, and Balance of Plant. Considered external interfaces with customers and partners, providing input to address complex technical problems and opportunities. Acted as primary contact point with customers, their representatives, and other external and internal organizations involved in project.
  • Developed positive working relationships with stakeholders to effectively coordinate work activities.
  • Collaborated with cross-functional teams to ensure seamless integration of new features into existing product lineups.
  • Implemented new strategies to reduce costs and improve efficiency of engineering team.
  • Led engineering teams to successfully complete projects on time and within budget.
  • Conducted thorough risk assessments to identify potential issues early in design process, minimizing costly rework later on.
  • Created detailed reports on engineering activities and findings
  • Developed positive working relationships with stakeholders to effectively coordinate work activities

Lead Commissioning Engineer, I&C (Instrumentation and Controls)

ALSTOM Asia Pacific Sdn Bhd
05.2007 - 11.2015
  • Led an I&C group of 8 to 12 engineers in commissioning activities for various power plant processes
  • Managerial responsibilities included planning, preparing, and executing commissioning activities, ensuring compliance with safety regulations and contractual obligations
  • Operational responsibilities included implementing and commissioning control systems and applications for power plant processes, providing assistance and reviews to erection and construction teams, and troubleshooting control systems
  • Functional responsibilities included ensuring that commercial and technical deviations were reported and followed up until completion
  • Also served as Test Simulator Commissioning Engineer, conducting pre-commissioning tasks and collaborating with Simulator Model Engineers.
  • Saved resources by identifying and rectifying design issues prior to installation, preventing costly rework.
  • Managed escalations from direct reports during testing and commissioning phase of project.
  • Verified resolution of differences in actual versus expected results and addressed development adjustments to plans.
  • Conducted factory acceptance tests to validate equipment functionality before shipment to site locations.
  • Coordinated industrial control system activities with consultants to guarantee fulfillment of necessary jobs on time.
  • Worked closely with operations and maintenance staff during transition from commissioning to production, ensuring smooth handover of systems.
  • Reviewed as-built drawings for accuracy upon completion of commissioning activities, ensuring seamless handover to operations teams.
  • Paid attention to detail while completing assignments.
  • Proven ability to develop and implement creative solutions to complex problems.

Maintenance, I&C (Instrumentation and Controls)

SIEMENS Power Generation
06.2004 - 05.2007
  • Managed maintenance activities for instrumentation and controls, ensuring operational reliability and availability of control systems
  • Developed and implemented preventive and corrective maintenance plans, assisted operations team during investigations, and participated in yearly inspections of gas turbines
  • Also served as Control System (Siemens TXP) Administrator and Plant Management System Administrator / Management Information System Administrator.
  • Assisted with day-to-day operations, working efficiently and productively with all team members.
  • Identified issues, analyzed information and provided solutions to problems.
  • Passionate about learning and committed to continual improvement.
  • Adaptable and proficient in learning new concepts quickly and efficiently.
  • Completed paperwork, recognizing discrepancies and promptly addressing for resolution.
  • Worked well in team setting, providing support and guidance.
  • Self-motivated, with strong sense of personal responsibility.

I&C (Instrumentation and Controls) Engineer

PT. Sayap Mas Utama
04.2003 - 05.2004
  • Engaged in instrumentation control engineering and project management tasks, including designing, calculating, and creating process flow diagrams and piping and instrumentation diagrams
  • Supervised and consulted with teams of contractors and vendors, ensuring adherence to project timelines and quality standards.
  • Reduced downtime by effectively troubleshooting and resolving complex control system issues.
  • Evaluated system performance data to identify areas for improvement and implement necessary modifications.
  • Monitored installation and operations to consistently meet rigorous customer requirements.
  • Assisted in installation of electrical systems and components for commercial and industrial applications.

Education

Sarjana Teknik (S.T.) - Engineering Physics

Sepuluh Nopember Institute of Technology (ITS)
Surabaya, Indonesia
04.1998 - 02.2003

Skills

Self Motivation

undefined

Work Summary

Instrumentation and Control (I&C) professional with nearly twenty years of experience in the Power Generation Industry. Demonstrated expertise in various facets of I&C, including Operation and Maintenance (O&M), Commissioning, Tendering, Engineering, and Project Management. Proven ability to lead and motivate teams to achieve project objectives, with a track record of successful international project assignments across Asia Pacific and Europe.

Accomplishments

    EPC PROJECT - C&I ENGINEERING:

  • May 2017 – Aug 2022
  • Coal Fired Power Plant 150 MW in Stung Hav, Sihanoukville,

    Cambodia Energy II Company Limited

    The Kingdom of Cambodia and Electricite du Cambodge (EDC)


  • May 2020 – Sep 2022
  • 140MW Combined Cycle Cogeneration Plant Project

    B. Grimm Power (Leam Chabang) 1 Limited, Thailand


  • July 2020 – Nov 2022
  • 140MW Combined Cycle Cogeneration Plant Project

    Amata B.Grimm Power 1, Thailand.


  • July 2020 – Dec 2022
  • 140MW Combined Cycle Cogeneration Plant Project

    Amata B.Grimm Power 2, Thailand.


  • Sep 2020 – Mar 2023
  • 2 x 140MW Combined Cycle Cogeneration Plant Project

    B.Grimm Power (AIE-MTP) Limited, Thailand.


  • Dec 2020 – Oct 2023
  • 140MW Combined Cycle Cogeneration Plant Project

    B.Grimm Power (Angthong) 2 Limited, Thailand.


  • Dec 2020 – Dec 2023
  • 140MW Combined Cycle Cogeneration Plant Project

    B.Grimm Power (Angthong) 3 Limited, Thailand.


    PROPOSAL WORK FOR DCS SCOPE:

  • Thailand – 2 x 9HA.02 SS CCPP 1300 MW
  • Malaysia – 2 x 9HA.02 SS CCPP 1440 MW

  • COMMISSIONING PROJECT:

    Malaysia

    January 2008 – February 2008

    Perlis Power Plant

    650MW Combined Cycle Gas Fired Power Plant

    Teknologi Tenaga Perlis Consortium (TTPC)


    Thailand

    July 2007 – January 2008

    Khaeng Khoi 2 Power Plant

    2 x 760MW Combined Cycle Power Plant

    Gulf Power Generation


    Australia

    April 2008 – January 2009

    Tallawarra Power Plant

    1 x 400MW Combined Cycle Power Plant

    TRUenergy


    Australia

    February 2009 – November 2009

    Colongra Simple Cycle Power Plant

    4 x 165MW Dual Fuel Power Station

    Delta Electricity


    United Kingdom

    January 2010 – October 2010

    Grain CHP Project

    3 x 425MW Combined Cycle Power Plant

    E.On Power


    Indonesia

    November 2010 – October 2011

    Muara Tawar 5 Project

    234MW Combined Cycle Power Plant

    PT. PLN


    Singapore

    June 2013 – August 2014

    Banyan CCP3 Project

    400MW Combined Cycle Power Plant

    Sembcorp Cogen Pte Ltd


    Singapore

    January 2012 – June 2013

    Keppel II Project

    2 x 400MW Combined Cycle Power Plant

    Keppel Merlimau Cogen Pte Ltd


    Malaysia

    November 2014 – April 2015

    Manjung 4 Project

    1000MW Supercritical Boiler Coal-Fired Power Plant

    TNB Janamanjung


    China

    July 2006 – October 2006

    Technical Field Assistance (TFA), Control System Commissioning Engineer

    Henan Zhengzhou Grid Connected Natural Gas Power Plant Project

    2 x 390MW Combined Cycle Power Plant

    Zhengzhou Combined Cycle Power Co., Ltd

Personal Information

  • Date of Birth: 03/25/79
  • Gender: Male
  • Nationality: Indonesian
  • Marital Status: Married

Training

  • 03/05/2012, 03/06/2012, ALSTOM Ltd, SIL3 Training, France
  • 01/30/2012, 01/31/2012, ALSTOM Power, ALSTOM International EHS Passport (AIEP) Training, Malaysia
  • 10/17/2011, 10/28/2011, ALSTOM Ltd, ALSPA CONTROGAS Training, Switzerland
  • 11/29/2010, 12/10/2010, ALSTOM India, Control System ALSPA Series 6 Training, India
  • 05/12/2007, 06/23/2007, ALSTOM Ltd, Comet and Expert Training, Switzerland
  • 04/04/2005, 04/25/2005, SIEMENS AG, Teleperm XP System Administrator Training, Germany
  • 03/21/2005, 03/28/2005, SIEMENS Indonesia, PT, PLC SIEMENS Simatic S7 200-300, Jakarta
  • 11/29/2004, 12/24/2004, SIEMENS AG, DCS Teleperm XP System Training, Jakarta
  • 11/2004, 11/2004, SIEMENS AG, Win_TS System Training, Jakarta
  • 07/13/2004, 07/17/2004, SIEMENS Muara Tawar II GTPP, onsite training basic GT and Generator Design, GT Control System, Teleperm XP Control System, and GT's Operation Sequences, Indonesia
  • 03/01/2003, 03/02/2003, Engineering Physics – ITS, ISO-9000:2000 Training, Surabaya

Technical Skills Summary

  • Hands-on skills in PLC Siemens S7–200 Programming (Micro/Win 32), PLC NAiS FP Series Programming (FPWIN GR), and Siemens LOGO! Modular Micro Controller (LogoSoft).
  • Hands-on skills in DCS TelepermXP Siemens.
  • Good knowledge about ABB Advant Control System (AC450 & AC160) and IIT800xA.
  • Work on Alstom ALSPA Control System (ControGAS, ControSTEAM, ControPLANT)
  • Good knowledge of GE Mark VIe Controls System
  • Work on Trusted - Triple Modular Redundant (TMR) Controller
  • Work on Vibration Monitoring Systems such as Bently Nevada and Vibrometer.
  • Knowledge of Interface protocols such as Modbus, Profibus, field bus, and Foundation Fieldbus.
  • Knowledge in Commissioning Support Simulator 3key-master
  • Knowledge in Digital Power Plant
  • Knowledge in High-Performance HMI (ISA-101)
  • Knowledge in Alarm Rationalization (ISA-18-2)
  • Pre-installation and Installation (Control System)
  • Pre-commissioning and Commissioning (I&C)
  • System troubleshooting
  • PID Control Tuning
  • Instrument calibration
  • Basic Engineering for SWAS, CEMS, Communication System, PES
  • Instrument Design, Hookup and bulk material selection
  • Communication System Bulk Design
  • Operation and Maintenance (O&M) of Power Plant (I&C)
  • Preventive/Corrective Maintenance
  • Warranty Engineer
  • Good communication in English
  • Proficient in the use of Windows, Microsoft Office
  • Good Knowledge of Windows Installation & Operations

Timeline

Head of Department, Engineering Project Division, I&C (Instrumentation and Controls)

TPSC Engineering (Malaysia) Sdn Bhd
05.2017 - Current

Lead Engineer/Global Design Leader, Controls Engineering

General Electric (GE)
12.2015 - 04.2017

Lead Commissioning Engineer, I&C (Instrumentation and Controls)

ALSTOM Asia Pacific Sdn Bhd
05.2007 - 11.2015

Maintenance, I&C (Instrumentation and Controls)

SIEMENS Power Generation
06.2004 - 05.2007

I&C (Instrumentation and Controls) Engineer

PT. Sayap Mas Utama
04.2003 - 05.2004

Sarjana Teknik (S.T.) - Engineering Physics

Sepuluh Nopember Institute of Technology (ITS)
04.1998 - 02.2003
Markus Hendrik Katilik