Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals. Pursuing full-time role that presents professional challenges and leverages interpersonal skills, effective time management, and problem-solving expertise.
Overview
17
17
years of professional experience
Work History
PJ Task Unit Leader
JGC
Yokohama, Japan
11.2021 - Current
Worked well in a team setting, providing support and guidance.
Passionate about learning and committed to continual improvement.
Self-motivated, with a strong sense of personal responsibility.
Managed time efficiently in order to complete all tasks within deadlines.
Excellent communication skills, both verbal and written.
Assisted with day-to-day operations, working efficiently and productively with all team members.
Demonstrated respect, friendliness and willingness to help wherever needed.
Paid attention to detail while completing assignments.
Organized and detail-oriented with a strong work ethic.
Learned and adapted quickly to new technology and software applications.
Resolved problems, improved operations and provided exceptional service.
Used strong analytical and problem-solving skills to develop effective solutions for challenging situations.
Proven ability to learn quickly and adapt to new situations.
Skilled at working independently and collaboratively in a team environment.
Piping Supervisor/ CMS Eng’r
JGC
Bintulu, Malaysia (New MRU)
3 2019 - 10.2019
Control and supervision on fabrication of permanent spool for tie-in.
Liaised with QC (JGC/MLNG) for the document needed to release spool testing.
Continuous monitoring and control of testing work, especially turn around spools.
Review and check drawings for constructability prior to spool fabrication.
Control of spool fabrication drawings to avoid double fabrication and check, keep track of daily welding reports, and monitor closely the required spool from the spool yard to the painting shop for immediate site erection works.
Control and check work in terms of quality and quantity.
Monitor work front, progress at site.
Involve in line checking, punch killing, prior to client line check, and testing.
Involve in test package preparation/control to expedite site activities.
Involve in joint locking in CMS for the test package.
Deal/Expedite QC for the pending document for the test pack.
Close monitor work front, preparation, and testing progress at site.
Involvement in final reinstatement at site and verification of documents needed to attach in test package.
Prepare test package using VMods system.
Improved overall project efficiency by effectively supervising piping installation and maintenance tasks.
Involve in checking the final documentation prior to test package closure, or handover.
Optimized resource allocation by accurately estimating material requirements and manpower needs for each project phase.
Communicated with stakeholders on job milestones.
Investigated and reported on accidents, injuries and near-miss incidents.
Piping Supervisor
JGC
Singapore (MCP)
6 2015 - 4 2017
Involve for preparation for turn around
(Line check for Tie location and blinding/de-blinding works for shut down)
Control and supervision on fabrication of temporary spools and permanent spool for turn around
Liaised QC (JGC/SRC) for the document needed to release spool testing
Continuous monitoring/control of testing work especially turn around spools
Reviews, and check drawings for constructability prior to spool fabrication
Monitoring of spool release to painting yard
Control of spool fabrication drawings to avoid double fabrication and check, keep track of daily welding reports and monitor closely the required spool from spool yard to painting shop for immediate site erection works
Plans required work activities to ensure that design drawings, equipment’s, tools and materials are available and extend all work possibilities for the workers and maximize their efficiency
Plan, schedules, and monitors progress with concern to Shop Work Volume (Dia-In) against shop required manpower
Control of fabrication progress
Control of fabrication extras
Monitors fabrication activities to ensure work efficiency, quality and workmanship meet project standard and specifications
Checks out and coordinate to perform the required testing to be done on shop fabricated spools
Ex.: leak tests for reinforcing pads, pre-testing for fire water lines which requires galvanizing works
Control and check work in terms of quality and quantity
Liaise with Safety Supervisor to achieve the application of Safe Work Methods
Involve in site preparation for site erection
Deal with other department for the sharing of area as per priority
Expedite spool delivery to site from painting yard/laydown
Involve in planning for crane location and parking
Monitor scaffolding progress for site erection
Expedite site erection as per plan
Monitor work front / progress at site
Involve in line checking/ punch killing prior to client line check and testing
Involve in test package preparation/control to expedite site activities
Involve in joint locking in CMS for the test package
Deal/Expedite QC for the pending document for the test pack
Close monitor work front/preparation and testing progress at site
Liaise to Pre-Com for their system priority
Involvement in final reinstatement at site and verification of document needed to attach in test package.
Mentored junior staff members, promoting professional development while reinforcing adherence to established protocols and procedures in the workplace.
Improved overall project efficiency by effectively supervising piping installation and maintenance tasks.
Participated in pre-construction meetings with clients, engineers, and other stakeholders to discuss project requirements, scope of work, and timelines for completion.
Maintained a strong safety culture within the team by conducting regular safety briefings and consistently enforcing compliance with established guidelines.
Piping Shop Supervisor
JGC
Qatar (Barzan)
07.2012 - 12.2014
Overall and day-to-day supervision of multinational workforces in the fabrication and testing of piping works.
Review and check drawings for constructability prior to spool fabrication.
Control of spool fabrication drawings to avoid double fabrication and check, keep track of daily welding reports, and monitor closely the required spool from the spool yard to the painting shop for immediate site erection works.
Plans require work activities to ensure that design drawings, equipment, tools, and materials are available and extend all work possibilities for the workers and maximize their efficiency.
Plan, schedules, and monitors progress with concern to Shop Work Volume (Dia-In) against shop required manpower (Welders) based on bar charts/S-curves (TIME vs MOTION) representations.
Control of fabrication progress.
Control of fabrication extras.
Monitors fabrication activities to ensure work efficiency, quality, and workmanship meet project standards and specifications.
Checks out and coordinates to perform the required testing to be done on shop-fabricated spools.
Ex.: Leak tests for reinforcing pads, pre-testing for fire water lines, which requires galvanizing works.
Supervise, develop, prepare, and coordinate hydro-testing and account for progress during progress meetings.
Liaise with QA/QC Manager and Piping Inspectors.
Control and check work in terms of quality and quantity.
Attend weekly progress meetings with the client.
Liaise with the Safety Supervisor to achieve the application of Safe Work Methods.
Participate and involve IIF (Incident Injury Free) and weekly safety walk-through with the client.
Assit to ACM
JGC
Qatar (Barzan)
10.2011 - 07.2022
Overall and day-to-day supervision of multinational workforces.
Plans require work activities to ensure that design drawings, equipment, tools, and materials are available and extend all work possibilities for the workers, and maximize their efficiency.
Plan, schedule, and monitor progress in general activities.
Checks and coordinates to perform the required test or inspection.
Liaise with QA/QC Manager and Inspectors.
Control and check work in terms of quality and quantity
Attend weekly progress meetings with the client.
Liaise with the Safety Supervisor to achieve the application of Safe Work Methods.
Participate and involve IIF (Incident Injury Free) and weekly safety walk-through with the client.
Involve in the construction of temporary facilities (site offices).
Involve in the installation work of the transformer.
Involve in the duct bank installation, from excavation until concrete pouring.
Monitoring of excavation works for electrical trench.
Direct supervision in cable pulling activities.
Close monitoring in cable termination.
Tie-in work of fire water line from the main source to construction site, provide water filling station for construction activities.
Involve in the construction of a wheel washing area.
Attend the final inspection of temporary facilities prior to occupancy with the fire department from RLIC.
Piping Supervisor
JGC
Saudi Arabia (NCP)
10.2009 - 05.2011
Engage in civil piping
Co-ordinate with civil worker
Full supervision on the worker who do the fusion bonding for civil piping/ holliday testing
Direct monitoring on installation of GRE, HDPE and galvanize pipe
Reviews and checks drawings for compliance to standards and specifications and for constructability
Supervised multi-national workforce on the fabrication and installation of piping works
Plans required work activities to ensure that design drawings, equipment’s, tools and materials are available for the workers
Reviews and, check Welders qualification records
Reviews and, check materials for compliance with project specification
Prepares Crane Safe Lift Plan and liaise with Safety Supervisor for the application of Safe Work Permit
Compiles documentation and records used by the fabricator, dimensional survey report, acceptance certificates on the complete fabrication and testing for the preparation of project record book
Prepares 3-week look ahead plan with due consideration to other discipline
Attend weekly progress meeting with Clients
Carries out Tool Box meeting, safety talk and applied good housekeeping
Fully abide and comply with the safety rules and regulations authorized by the company
Keep track of daily welding reports and monitor closely the required spool from spool yard to painting shop for immediate site erection works
Supervise, develop, prepares and coordinate Hydro-testing and account for progress during progress meetings
Liaise with QA / QC Piping Inspectors
Control and check work of subcontractors in terms of quality and quantity
Check the planning and physical progress of subcontractors
Issue written instructions to subcontractors
Monitors construction activities to ensure work efficiency, quality and workmanship meet project standard and specifications
Participate in Engineering of field modification works
Liaise with Safety Supervisor to achieve the application of Safe Work Methods
Monitor punch out of installed work.
Piping Supervisor
JGC
Saudi Arabia (ROPP)
04.2008 - 12.2008
Reviews and checks drawings for compliance to standards and specifications and for constructability
Supervised multi-national workforce on the fabrication and installation of piping works
Plans required work activities to ensure that design drawings, equipment’s, tools and materials are available for the workers
Reviews and, check Welders qualification records
Reviews and, check materials for compliance with project specification
Prepares Crane Safe Lift Plan and liaise with Safety Supervisor for the application of Safe Work Permit
Compiles documentation and records used by the fabricator, dimensional survey report, acceptance certificates on the complete fabrication and testing for the preparation of project record book
Prepares 3-week look ahead plan with due consideration to other discipline
Attend weekly progress meeting with Clients
Carries out Tool Box meeting, safety talk and applied good housekeeping
Fully abide and comply with the safety rules and regulations authorized by the company
Reviews, and check drawings for constructability prior to spool fabrication
Keep track of daily welding reports and monitor closely the required spool from spool yard to painting shop for immediate site erection works
Supervise, develop, prepares and coordinate Hydro-testing and account for progress during progress meetings
Liaise with QA / QC Manager and Piping Inspectors
Control and check work of subcontractors in terms of quality and quantity
Check the planning and physical progress of subcontractors
Issue written instructions to subcontractors
Monitors construction activities to ensure work efficiency, quality and workmanship meet project standard and specifications
Participate in Engineering of field modification works
Liaise with Safety Supervisor to achieve the application of Safe Work Methods.
Piping Supervisor / Reinstatement
JGC
Saudi Arabia (JCP)
07.2007 - 04.2008
Involve in line checking
Full implementation of all quality requirements
Liaise / provide engineering assistance with regards to field modifications
Supervised multi-national workforce on the installation / erection, punch list work, leak test
Arrange all means and effort to achieve a maximum extent of work possibilities for working crews
Liaise with Safety Supervisor for the application of Safe Work Permit
Plans required work activities to ensure that design drawings, equipment’s, tools and materials are available for the workers
Reviews and check welder’s qualification and performance records
Reviews and check materials for compliance with project specification
Regular reporting of progress and quality towards Area Manager
Reports and follow-up near misses, accidents and any other incident with all applicable persons and departments thru administration support
Performs other similar or related functions a required
Provide guidelines, work breakdown structure for implementing and completing the work on time under ideal conditions
Monitors construction activities to ensure work efficiency, quality and workmanship meet project standard and specification
Attend weekly progress meetings with subcontractors
Check the planning and physical progress of subcontractors
Issue written instructions to subcontractors
Control and check work of subcontractors in terms of quality and quantity